Construction
Marina Expansion, Month 9
Monthly capture from three fixed positions since groundbreaking. Same frame every visit, so progress is directly comparable.
Repeatable waypoints mean each month lands within a metre or two of the last. The comparison frames go straight into investor updates without any post-production alignment.
Nine months in, the timelapse has become the most-used asset in the project.


